Validation · Drying & storage cabinets
Validation of drying and storage cabinets
We test and validate your drying and storage cabinets for reprocessed endoscopes and prove that drying and storage maintain the hygienic quality of your endoscopes until the next use – manufacturer-independent and traceably documented.
- SN EN 16442
- ISO 14644-1
- GPAE
- MedDO (SR 812.213)
Purpose
Reprocessing does not end with the EWD
Residual moisture in the channels can promote the growth of microorganisms. Drying and storage cabinets are intended to dry reprocessed endoscopes reliably and maintain their microbiological quality during storage. Whether this succeeds depends on the cabinet, connection adapters, endoscope types and operating conditions.
Our validation based on SN EN 16442 proves that your cabinet dries with your endoscopes and adapters and maintains clean air – as a basis for your release.
Related service: EWD validation – the upstream process step.
Typical test objects
- Storage cabinets with controlled environmental conditions for flexible endoscopes
- Cabinets with drying function for endoscope channels
- Endoscope connection adapters of the cabinets
- Drying and storage systems for other reprocessed medical devices
Scope of validation
Installation, operational and performance qualification
Validation is divided into three successive stages. During requalification, the tests are repeated periodically or after relevant changes.
Installation qualification
Installation, specification, software, connections and documentation system according to the manufacturer's information.
Operational qualification
Air change, overpressure, temperature, humidity, dew point of the compressed air, air flow at all adapters and alarm simulation.
Performance qualification
Channel drying on one of your endoscopes, particles (ISO class 8), airborne microorganisms, surfaces and sampling of an endoscope after the storage time.
What you receive
Complete, traceable documentation – as the basis for your release, internal audits and official inspections.
- Validation plan with defined tests and acceptance criteria
- Measurement records and laboratory reports of the tests carried out
- Assessment of the results with traceable justification
- Validation report as the basis for your release
- Requalification: recommended annually, 4–8 weeks after maintenance
Standards & basis
Standards-compliant and in line with Swiss requirements
We follow the applicable standards, guidelines and regulatory requirements – and document what each assessment is based on.
Procedure
How we proceed
Enquiry & inventory
We record your cabinets, endoscope types, connection adapters, programmes and general conditions and clarify the scope of service.
Validation plan
Tests, measuring equipment, acceptance criteria and dates are defined and agreed with you.
On-site execution
Testing with calibrated measuring equipment; samples are evaluated in the laboratory.
Assessment
The measurement results are compared with the requirements and standards and professionally assessed.
Report & release
Validation report with release, recommendations and date of the next validation.
For routine monitoring
Suitable products from our online shop
Between validations, you safeguard your process with suitable indicators, test kits and devices.
ENDO test kit Fuji 5-600 series sampling set
ENDO test kit Fuji 700 series sampling set
ENDO test kit Pentax sampling set
Compressor, oil-free, compact, with compressed air gun
Compressor, oil-free, 25 l, with compressed air gun
Sets & routine control
All products for routine monitoring – organised by application.
Frequently asked questions
Good to know
Why is drying the endoscope channels so important?
Residual moisture in the channels can promote the growth of microorganisms. SN EN 16442 therefore sets requirements for the drying function of storage cabinets and their testing.
How long may endoscopes be stored in the cabinet?
You define the maximum storage time based on the manufacturer's information. During validation, we sample an endoscope after the defined storage time, e.g. 72 hours.
Do you validate cabinets from all manufacturers?
Yes. We work independently of manufacturers and validate devices of various makes.
Do you also test the stored endoscopes?
Yes. The channels and distal end of a stored endoscope are sampled and evaluated in the laboratory. You can find sampling sets in our online shop.
Request a quote
Non-binding quote for your facility
Briefly tell us the device type, number and make. We will get back to you personally and prepare a quote that suits your equipment.
- Personal response from our specialists
- Manufacturer-independent for all makes
- Active throughout Switzerland