Validation · Drying & storage cabinets

Validation of drying and storage cabinets

We test and validate your drying and storage cabinets for reprocessed endoscopes and prove that drying and storage maintain the hygienic quality of your endoscopes until the next use – manufacturer-independent and traceably documented.

  • SN EN 16442
  • ISO 14644-1
  • GPAE
  • MedDO (SR 812.213)

Purpose

Reprocessing does not end with the EWD

Residual moisture in the channels can promote the growth of microorganisms. Drying and storage cabinets are intended to dry reprocessed endoscopes reliably and maintain their microbiological quality during storage. Whether this succeeds depends on the cabinet, connection adapters, endoscope types and operating conditions.

Our validation based on SN EN 16442 proves that your cabinet dries with your endoscopes and adapters and maintains clean air – as a basis for your release.

Related service: EWD validation – the upstream process step.

Typical test objects

  • Storage cabinets with controlled environmental conditions for flexible endoscopes
  • Cabinets with drying function for endoscope channels
  • Endoscope connection adapters of the cabinets
  • Drying and storage systems for other reprocessed medical devices

Scope of validation

Installation, operational and performance qualification

Validation is divided into three successive stages. During requalification, the tests are repeated periodically or after relevant changes.

IQ

Installation qualification

Installation, specification, software, connections and documentation system according to the manufacturer's information.

OQ

Operational qualification

Air change, overpressure, temperature, humidity, dew point of the compressed air, air flow at all adapters and alarm simulation.

PQ

Performance qualification

Channel drying on one of your endoscopes, particles (ISO class 8), airborne microorganisms, surfaces and sampling of an endoscope after the storage time.

What you receive

Complete, traceable documentation – as the basis for your release, internal audits and official inspections.

  • Validation plan with defined tests and acceptance criteria
  • Measurement records and laboratory reports of the tests carried out
  • Assessment of the results with traceable justification
  • Validation report as the basis for your release
  • Requalification: recommended annually, 4–8 weeks after maintenance

Standards & basis

Standards-compliant and in line with Swiss requirements

We follow the applicable standards, guidelines and regulatory requirements – and document what each assessment is based on.

SN EN 16442Storage cabinets with controlled environmental conditions for reprocessed, thermolabile endoscopes – requirements and test methods
ISO 14644-1Cleanroom classes – basis of particle measurement in the cabinet
GPAEGood practice for reprocessing flexible, thermolabile endoscopes – basis for the microbiological assessment
MedDO (SR 812.213)Medical Devices Ordinance – maintenance obligation for medical devices

Procedure

How we proceed

  1. Enquiry & inventory

    We record your cabinets, endoscope types, connection adapters, programmes and general conditions and clarify the scope of service.

  2. Validation plan

    Tests, measuring equipment, acceptance criteria and dates are defined and agreed with you.

  3. On-site execution

    Testing with calibrated measuring equipment; samples are evaluated in the laboratory.

  4. Assessment

    The measurement results are compared with the requirements and standards and professionally assessed.

  5. Report & release

    Validation report with release, recommendations and date of the next validation.

Frequently asked questions

Good to know

Why is drying the endoscope channels so important?

Residual moisture in the channels can promote the growth of microorganisms. SN EN 16442 therefore sets requirements for the drying function of storage cabinets and their testing.

How long may endoscopes be stored in the cabinet?

You define the maximum storage time based on the manufacturer's information. During validation, we sample an endoscope after the defined storage time, e.g. 72 hours.

Do you validate cabinets from all manufacturers?

Yes. We work independently of manufacturers and validate devices of various makes.

Do you also test the stored endoscopes?

Yes. The channels and distal end of a stored endoscope are sampled and evaluated in the laboratory. You can find sampling sets in our online shop.

Request a quote

Non-binding quote for your facility

Briefly tell us the device type, number and make. We will get back to you personally and prepare a quote that suits your equipment.

  • Personal response from our specialists
  • Manufacturer-independent for all makes
  • Active throughout Switzerland
By submitting, you agree to the processing of your details in accordance with our privacy policy.